NeutrinoResearch Hub
Under construction

Hyper-K

Hyper-Kamiokande

The next-generation 258-kt water-Cherenkov detector. Eight times the fiducial volume of Super-Kamiokande, designed to study δ_CP, the mass ordering, atmospheric and solar oscillations, supernova bursts, and proton decay.

Specifications

Full name Hyper-Kamiokande
Host institution University of Tokyo, ICRR & KEK
Spokesperson F. Di Lodovico
Status Under construction
First data 2027
Location Kamioka, Gifu, Japan
Technique Water-Cherenkov detector
Channel(s) Atmospheric, accelerator (J-PARC), solar, supernova ν
Depth 650 m below Mt. Nijugo
Fiducial mass / volume 188 kt (fiducial) of ultra-pure water
Baseline 295 km (J-PARC beam)
Energy range 5 MeV – 10 GeV

Sensitivity CP-violation 5σ discovery for ~60% of δ_CP within 10 yr; ~10⁵ events from a 10-kpc supernova.

Recent result

Cavern excavation completed in 2024; PMT mass-production ongoing. First light scheduled for 2027.

Detector architecture

Hyper-Kamiokande will be a 258-kt cylindrical water Cherenkov detector — almost 8× the Super-K fiducial volume — located 8 km from the Super-K site at a depth of 600 m. The instrument uses 40,000 50-cm PMTs at 20% photocathode coverage; the design choice of slightly lower coverage compared to Super-K reflects the larger relative-to-absolute precision target.

The Hyper-K detector serves as the far end of an upgraded J-PARC beam at 1.3 MW, with a new intermediate water Cherenkov detector (IWCD) at ~1 km baseline for systematic-uncertainty reduction.

Scientific case

The primary goals are δCP at 5σ for ~60% of values within 10 years of running; mass ordering at >3σ in the same period; and precision oscillation measurements at the few-percent level. Secondary goals: proton-decay searches at sensitivity 10× Super-K, ~10⁵ supernova-burst neutrinos from a 10 kpc CCSN, and atmospheric-ν measurements at the 1% level.

Hyper-K is timed to overlap with DUNE: the two complementary apparatuses (off-axis narrow-band beam vs wide-band on-axis beam, water Cherenkov vs LArTPC) provide cross-systematic redundancy on the same physics question.

Milestones

  1. 2015 Letter of Intent submitted.
  2. 2020 Project formally approved by MEXT and KEK.
  3. 2021 Excavation of the underground cavern begins.
  4. 2024 Cavern excavation complete; tank construction begins.
  5. 2027 First beam expected; commissioning runs.
  6. 2032 δ_CP at 5σ for favourable values; full physics programme.

Recent highlights

The 2024 cavern-excavation milestone places Hyper-K firmly on track for 2027 first beam — only one year behind the original 2026 target. PMT mass-production runs at Hamamatsu have delivered ~85% of the required 40,000 modules through 2024.

Future plans

The IWCD intermediate detector and the upgraded ND280 near detector at J-PARC are part of the same commissioning timeline. A second detector tank in Korea (KNO/T2HKK) at 1100 km baseline is under technical study and would resolve the residual mass-ordering ambiguity even in the case of unfavourable δ_CP.

Collaboration

Collaboration size ≈ 500 members, 90 institutions in 22 countries

References

  1. Hyper-K Collab., Design Report, arXiv:1805.04163

Collaboration website ↗


Other experiments